← Back to map

Chicopee Granby Road Solar

Hampden County, Massachusetts · EIA plant ID 59626 · Operator: Citizens Enterprises Corporation
SolarSolar PhotovoltaicISONEBA: ISNE
Nameplate2MWSummer 2 MW
Generators1in service
Net generation2GWh12 mo to Dec 2025
Capacity factor17%solar units, summer MW
Heat rate—thermal plants only
First online2015

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300MWh20152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20162018202020222024202617.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20152.216.0%—
20162.819.9%—
20172.517.8%—
20182.417.0%—
20192.517.8%—
20202.518.1%—
20212.416.8%—
20222.719.0%—
20232.417.4%—
20242.215.7%—
20252.417.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PV1Solar PhotovoltaicPV1.61.6Jan 2015Operating—coming soon

Owner / operator

Operator: Citizens Enterprises Corporation. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Citizens Solar Holdings III, LLC100.0%2 MW

Nearby plants

Within 80 km.
Chicopee Hydroelectric Station2 MW1.1 km
Front Street8 MW1.2 km
Dwight1 MW1.6 km
Chicopee BESS—2.2 km
Chicopee Solar3 MW3.2 km
Chicopee River Solar2 MW3.7 km