Blevins Solar & Storage
Falls County, Texas · EIA plant ID 69414 · Operator: Geronimo Energy
Nameplate450MWSummer 450 MW
Generators3in service
Net generation508GWh12 mo to Aug 2026
Capacity factor87%solar units, summer MW
Heat rate—thermal plants only
First online2025
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2025 | 256.3 | — | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| BSBES | Batteries | BA | 180 | 180 | Nov 2025 | Operating | — | coming soon |
| BSLR2 | Solar Photovoltaic | PV | 132 | 132 | Jun 2026 | Operating | — | coming soon |
| BSLR3 | Solar Photovoltaic | PV | 138 | 138 | Jun 2026 | Operating | — | coming soon |
Owner / operator
Operator: Geronimo Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Geronimo Energy | 100.0% | 450 MW |
Nearby plants
Within 80 km.
| Big Elm Storage | — | 8.4 km |
| Big Elm Solar | 200 MW | 8.4 km |
| Eddy II | 10 MW | 11.4 km |
| Limewood Bell Renewables Solar | — | 11.6 km |
| Braswell Solar | — | 15.6 km |
| BPL Sol Solar LLC | 100 MW | 17.9 km |