Big Elm StorageUnder construction

Bell County, Texas · EIA plant ID 68181 · Operator: Big Elm Storage, LLC
BatteryERCOTBA: ERCO

100 MW under construction (Batteries), first expected Dec 2026 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 100 MW building
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BELMBBatteriesBA100100planned Dec 2026Under construction—coming soon

Owner / operator

Operator: Big Elm Storage, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Big Elm Solar200 MW0 km
Limewood Bell Renewables Solar—4.4 km
Blevins Solar & Storage450 MW8.4 km
Panda Temple Power Station1,606 MW13.4 km
HEBTEMDistCenter2A6 MW13.8 km
HEBTEMDistCenter6 MW13.8 km