Limewood Bell Renewables SolarUnder construction

Bell County, Texas · EIA plant ID 68853 · Operator: Modal Power LLC
SolarERCOTBA: ERCO

204 MW under construction (Solar Photovoltaic), first expected Nov 2026 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 204 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
LMWODSolar PhotovoltaicPV204204planned Nov 2026Under construction—coming soon

Owner / operator

Operator: Modal Power LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Big Elm Storage—4.4 km
Big Elm Solar200 MW4.4 km
Panda Temple Power Station1,606 MW9.8 km
HEBTEMDistCenter2A6 MW9.8 km
HEBTEMDistCenter6 MW9.8 km
Blevins Solar & Storage450 MW11.6 km