Santa Teresa Solar

Dona Ana County, New Mexico · EIA plant ID 68866 · Operator: Santa Teresa Solar
SolarSolar PhotovoltaicBA: EPE

150 MW under construction (Batteries), first expected Oct 2026 · EIA-860M

Nameplate150MWSummer 150 MW
Generators1in service · 150 MW building
Net generation99GWh12 mo to Aug 2026
Capacity factor89%solar units, summer MW
Heat rate—thermal plants only
First online2026

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
010203040GWh

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%2026202789.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
STSSolar PhotovoltaicPV150150Aug 2026Operating—coming soon
SANBatteriesBA150150planned Oct 2026Under construction—coming soon

Owner / operator

Operator: Santa Teresa Solar. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Santa Teresa Solar100.0%150 MW

Nearby plants

Within 80 km.
Roadrunner Solar20 MW2.8 km
Milagro Solar I225 MW5.5 km
Four Peaks Camino Realretired10 km
Rio Grande348 MW14.3 km
Providence Memorial Hospital4 MW19.1 km
Phelps Dodge Refining20 MW29.4 km