← Back to map

Roadrunner Solar

Dona Ana County, New Mexico · EIA plant ID 57338 · Operator: NRG Solar Roadrunner
SolarSolar PhotovoltaicBA: EPE
Nameplate20MWSummer 20 MW
Generators1in service
Net generation47GWh12 mo to Dec 2025
Capacity factor27%solar units, summer MW
Heat rate—thermal plants only
First online2011

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
01020GWh201120122013201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2012201420162018202020222024202626.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201118.525.1%—
201253.530.4%—
20135330.2%—
201451.429.3%—
201550.528.8%—
201652.429.8%—
201752.229.8%—
201849.528.3%—
201951.229.2%—
202049.928.4%—
202147.427.1%—
20224726.8%—
202372.641.4%—
202446.526.5%—
20254726.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV20.220Aug 2011Operating—coming soon

Owner / operator

Operator: NRG Solar Roadrunner. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
NRG Solar Roadrunner100.0%20 MW

Nearby plants

Within 80 km.
Santa Teresa Solar150 MW2.8 km
Milagro Solar I225 MW3 km
Four Peaks Camino Realretired7.8 km
Rio Grande348 MW12 km
Providence Memorial Hospital4 MW16.5 km
Phelps Dodge Refining20 MW26.8 km