Four Peaks Camino RealRetired
Dona Ana County, New Mexico · EIA plant ID 60696 · Operator: ENERGYneering Solutions, Inc
×3 MW other retired since 2020 (latest Feb 2025)
Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2016 | 0.9 | 2.9% | — |
| 2017 | 0.6 | 2.2% | — |
| 2018 | 5 | 17.7% | — |
| 2019 | 15.7 | 55.9% | — |
| 2020 | 18.9 | 67.3% | — |
| 2021 | 17.7 | 63.1% | — |
| 2022 | 9.5 | 34.1% | — |
| 2023 | 15.8 | 56.2% | — |
| 2024 | 11.8 | 42.1% | — |
| 2025 | 1.5 | 64.3% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Landfill Gas | IC | 1.6 | 1.6 | Apr 2008 | Retired Feb 2025 | — | coming soon |
| 2 | Landfill Gas | IC | 1.6 | 1.6 | Apr 2008 | Retired Feb 2025 | — | coming soon |
Owner / operator
Operator: ENERGYneering Solutions, Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| Rio Grande | 348 MW | 4.4 km |
| Milagro Solar I | 225 MW | 4.9 km |
| Roadrunner Solar | 20 MW | 7.8 km |
| Providence Memorial Hospital | 4 MW | 9.8 km |
| Santa Teresa Solar | 150 MW | 10 km |
| Phelps Dodge Refining | 20 MW | 19.8 km |