Easley Solar
Riverside County, California · EIA plant ID 68758 · Operator: IP Easley, LLC
290 MW under construction · 300 MW planned (Batteries, Solar Photovoltaic), first expected Oct 2026 · EIA-860M
Nameplate350MWSummer 350 MW
Generators1in service · 290 MW building
Net generation-14GWh12 mo to Aug 2026
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online2026
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| IPEA2 | Batteries | BA | 350 | 350 | Jun 2026 | Operating | — | coming soon |
| IPEA1 | Solar Photovoltaic | PV | 290 | 290 | planned Oct 2026 | Under construction | — | coming soon |
| IPEA3 | Batteries | BA | 300 | 300 | planned Mar 2028 | Planned | — | coming soon |
Owner / operator
Operator: IP Easley, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| IP Easley, LLC | 100.0% | 350 MW |
Nearby plants
Within 80 km.
| Arica Solar | 399 MW | 2.6 km |
| Victory Pass | 250 MW | 2.6 km |
| SE Athos II, LLC | 200 MW | 4.2 km |
| Athos Solar Project | 250 MW | 4.2 km |
| Oberon Solar Project | 375 MW | 5.3 km |
| Oberon II Solar Project | 375 MW | 5.3 km |