← Back to map

Easley Solar

Riverside County, California · EIA plant ID 68758 · Operator: IP Easley, LLC
BatteryBatteriesCAISOBA: CISO

290 MW under construction · 300 MW planned (Batteries, Solar Photovoltaic), first expected Oct 2026 · EIA-860M

Nameplate350MWSummer 350 MW
Generators1in service · 290 MW building
Net generation-14GWh12 mo to Aug 2026
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online2026

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-6-4-20GWh

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
IPEA2BatteriesBA350350Jun 2026Operating—coming soon
IPEA1Solar PhotovoltaicPV290290planned Oct 2026Under construction—coming soon
IPEA3BatteriesBA300300planned Mar 2028Planned—coming soon

Owner / operator

Operator: IP Easley, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
IP Easley, LLC100.0%350 MW

Nearby plants

Within 80 km.
Arica Solar399 MW2.6 km
Victory Pass250 MW2.6 km
SE Athos II, LLC200 MW4.2 km
Athos Solar Project250 MW4.2 km
Oberon Solar Project375 MW5.3 km
Oberon II Solar Project375 MW5.3 km