Oberon II Solar Project

Riverside County, California · EIA plant ID 65735 · Operator: Intersect USA, LLC
SolarBatteriesSolar PhotovoltaicCAISOBA: CISO
Nameplate375MWSummer 375 MW
Generators2in service
Net generation560GWh12 mo to Aug 2026
Capacity factor26%solar units, summer MW
Heat rate—thermal plants only
First online2023

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0204060GWh202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2023202420252026202726.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2023164.330.6%—
2024554.426.0%—
2025589.827.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
OBIIBBatteriesBA125125Sep 2023Operating—coming soon
OBIIPSolar PhotovoltaicPV250250Oct 2023Operating—coming soon

Owner / operator

Operator: Intersect USA, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Intersect USA, LLC100.0%375 MW

Nearby plants

Within 80 km.
Oberon Solar Project375 MW0 km
Maverick Solar, LLC125 MW3.2 km
Maverick Solar 4, LLC100 MW3.2 km
Maverick Solar 7, LLC132 MW3.2 km
Maverick Solar 6, LLC150 MW3.2 km
SE Athos II, LLC200 MW3.5 km