← Back to map

Maverick Solar, LLC

Riverside County, California · EIA plant ID 62178 · Operator: Maverick Solar, LLC
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate125MWSummer 125 MW
Generators1in service
Net generation309GWh12 mo to Aug 2026
Capacity factor28%solar units, summer MW
Heat rate—thermal plants only
First online2020

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
010203040GWh202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%2020202120222023202420252026202728.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202054.558.6%—
2021332.830.4%—
2022269.124.6%—
2023296.927.1%—
2024375.434.2%—
2025369.733.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
MAV01Solar PhotovoltaicPV125125Dec 2020Operating—coming soon

Owner / operator

Operator: Maverick Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Maverick Solar, LLC100.0%125 MW

Nearby plants

Within 80 km.
Maverick Solar 7, LLC132 MW0 km
Maverick Solar 4, LLC100 MW0 km
Maverick Solar 6, LLC150 MW0 km
Oberon Solar Project375 MW3.2 km
Oberon II Solar Project375 MW3.2 km
Easley Solar350 MW5.6 km