Athos Solar Project

Riverside County, California · EIA plant ID 63300 · Operator: SE Athos I, LLC
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate250MWSummer 250 MW
Generators1in service
Net generation670GWh12 mo to Aug 2026
Capacity factor31%solar units, summer MW
Heat rate—thermal plants only
First online2022

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
020406080GWh2023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20222023202420252026202730.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2022440.334.3%—
202370732.3%—
2024618.128.1%—
2025700.232.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
IPAT1Solar PhotovoltaicPV250250Jun 2022Operating—coming soon
IPAT2Solar PhotovoltaicPV200200planned Apr 2022not_current—coming soon

Owner / operator

Operator: SE Athos I, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
SE Athos I, LLC100.0%250 MW

Nearby plants

Within 80 km.
SE Athos II, LLC200 MW0 km
Oberon II Solar Project375 MW3.5 km
Oberon Solar Project375 MW3.5 km
Easley Solar350 MW4.2 km
Desert Harvest II LLC105 MW5.9 km
Desert Harvest, LLC80 MW5.9 km