Darkwood SolarPlanned

Comanche County, Texas · EIA plant ID 68478 · Operator: Mustang Creek Solar I, LLC
SolarERCOTBA: ERCO

151 MW planned (Solar Photovoltaic), first expected Oct 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
DRKSolar PhotovoltaicPV150.7150.7planned Oct 2027Planned—coming soon

Owner / operator

Operator: Mustang Creek Solar I, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Logans Gap Wind LLC200 MW27.8 km
Grizzly Ridge Solar100 MW29 km
Erath County Solar—29.3 km
Flat Top Wind I200 MW32 km
Silver Star I Wind Power Project53 MW41.6 km
TPE Erath Solar, LLC10 MW42.4 km