Darkwood SolarPlanned
Comanche County, Texas · EIA plant ID 68478 · Operator: Mustang Creek Solar I, LLC
151 MW planned (Solar Photovoltaic), first expected Oct 2027 · EIA-860M
Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| DRK | Solar Photovoltaic | PV | 150.7 | 150.7 | planned Oct 2027 | Planned | — | coming soon |
Owner / operator
Operator: Mustang Creek Solar I, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| Logans Gap Wind LLC | 200 MW | 27.8 km |
| Grizzly Ridge Solar | 100 MW | 29 km |
| Erath County Solar | — | 29.3 km |
| Flat Top Wind I | 200 MW | 32 km |
| Silver Star I Wind Power Project | 53 MW | 41.6 km |
| TPE Erath Solar, LLC | 10 MW | 42.4 km |