← Back to map

Grizzly Ridge Solar

Hamilton County, Texas · EIA plant ID 66410 · Operator: Grizzly Ridge Solar LLC
SolarSolar PhotovoltaicERCOTBA: ERCO

10 MW under construction (Batteries), first expected Dec 2026 · EIA-860M

Nameplate100MWSummer 100 MW
Generators1in service · 10 MW building
Net generation26GWh12 mo to Aug 2026
Capacity factor3%solar units, summer MW
Heat rate—thermal plants only
First online2023

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
01020GWh2023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%50%100%202320242025202620273.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2023210.395.3%—
2024159.618.2%—
2025117.713.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
375Solar PhotovoltaicPV100100Oct 2023Operating—coming soon
596BatteriesBA1010planned Dec 2026Under construction—coming soon

Owner / operator

Operator: Grizzly Ridge Solar LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Grizzly Ridge Solar LLC100.0%100 MW

Nearby plants

Within 80 km.
Darkwood Solar—29 km
Priddy Wind Project302 MW34 km
Flat Top Wind I200 MW37.3 km
Erath County Solar—39.2 km
Castle Gap Wind197 MW40.7 km
Ryan Storage—45.3 km