← Back to map

SR MetterPlanned

Candler County, Georgia · EIA plant ID 68250 · Operator: SR Metter, LLC
SolarBA: TVA

80 MW planned (Solar Photovoltaic), first expected Dec 2026 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
METTRSolar PhotovoltaicPV79.779.7planned Dec 2026Planned—coming soon

Owner / operator

Operator: SR Metter, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Live Oak Solar, LLC51 MW12.5 km
Bulloch County GA S4 LLC3 MW25.1 km
Bulloch County GA S3 LLC3 MW25.5 km
Reidsville Renewables, Inc.3 MW28.3 km
Statesboro Solar LLC3 MW30.5 km
Curry Solar1 MW31.3 km