← Back to map

Live Oak Solar, LLC

Candler County, Georgia · EIA plant ID 60063 · Operator: Live Oak Solar, LLC
SolarSolar PhotovoltaicBA: SOCO
Nameplate51MWSummer 51 MW
Generators1in service
Net generation95GWh12 mo to Aug 2026
Capacity factor21%solar units, summer MW
Heat rate—thermal plants only
First online2016

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02.557.510GWh2017201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20162018202020222024202621.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20165.915.6%—
201799.122.2%—
201898.121.9%—
2019102.222.9%—
202098.221.9%—
202197.221.8%—
2022100.222.4%—
202393.520.9%—
202494.121.0%—
202584.518.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
LVEOKSolar PhotovoltaicPV5151Dec 2016Operating—coming soon

Owner / operator

Operator: Live Oak Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Live Oak Solar, LLC100.0%51 MW

Nearby plants

Within 80 km.
SR Metter—12.5 km
Bulloch County GA S4 LLC3 MW26.8 km
Bulloch County GA S3 LLC3 MW27.2 km
Conez Solar, LLC—27.6 km
Statesboro Solar LLC3 MW28.5 km
Georgia Power at Swainsboro3 MW28.7 km