Reidsville Renewables, Inc.
Tattnall County, Georgia · EIA plant ID 65995 · Operator: Safari Energy, LLC
Nameplate3MWSummer 3 MW
Generators1in service
Net generation8GWh12 mo to Dec 2025
Capacity factor29%solar units, summer MW
Heat rate—thermal plants only
First online2023
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2023 | 5.7 | 51.5% | — |
| 2024 | 7.5 | 28.6% | — |
| 2025 | 7.7 | 29.4% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 20052 | Solar Photovoltaic | PV | 3 | 3 | Aug 2023 | Operating | — | coming soon |
Owner / operator
Operator: Safari Energy, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Safari Energy, LLC | 100.0% | 3 MW |
Nearby plants
Within 80 km.
| Curry Solar | 1 MW | 3 km |
| Edwin I Hatch | 1,848 MW | 24.7 km |
| Baxley | 25 MW | 28.2 km |
| SR Metter | — | 28.3 km |
| SR Toombs, LLC | 250 MW | 36.8 km |
| Live Oak Solar, LLC | 51 MW | 40 km |