Amazon BDL4
Hartford County, Connecticut · EIA plant ID 68013 · Operator: Telyon AMZ Windsor LLC
Nameplate4MWSummer 4 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor11%solar units, summer MW
Heat rate—thermal plants only
First online2025
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2025 | 3.7 | 10.8% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| BDL4 | Solar Photovoltaic | PV | 3.9 | 3.9 | Jan 2025 | Operating | — | coming soon |
Owner / operator
Operator: Telyon AMZ Windsor LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Telyon AMZ Windsor LLC | 100.0% | 4 MW |
Nearby plants
Within 80 km.
| Rainbow (CT) | 8 MW | 3.2 km |
| Bradley Energy Center | 6 MW | 3.3 km |
| Algonquin Windsor Locks | 71 MW | 3.4 km |
| CT Airport Authority Solar One | — | 3.5 km |
| Windsor Locks | — | 3.6 km |
| Windsor Solar One | 3 MW | 6 km |