← Back to map

Rainbow (CT)

Hartford County, Connecticut · EIA plant ID 559 · Operator: Farmington River Power Company
HydroConventional HydroelectricISONEBA: ISNE
Nameplate8MWSummer 8 MW
Generators2in service
Net generation19GWh12 mo to Aug 2026
Capacity factor28%hydro units, summer MW
Heat rate—thermal plants only
First online1925

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%2005201020152020202527.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200124.233.7%—
200218.425.6%—
200342.859.6%—
20043346.9%—
200537.954.1%—
200642.560.6%—
200726.237.5%—
200843.161.4%—
200939.255.9%—
201030.343.2%—
201149.670.7%—
201223.633.6%—
201333.347.5%—
201432.245.9%—
201522.732.4%—
201614.520.6%—
201720.829.7%—
201838.855.4%—
201932.546.4%—
202024.434.8%—
202137.853.9%—
202225.236.0%—
202335.350.4%—
202429.441.8%—
202520.929.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Conventional HydroelectricHY44Dec 1925Operating—coming soon
2Conventional HydroelectricHY44Dec 1925Operating—coming soon

Owner / operator

Operator: Farmington River Power Company. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Farmington River Power Company100.0%8 MW

Nearby plants

Within 80 km.
Windsor Locks—1.5 km
Bradley Energy Center6 MW1.6 km
CT Airport Authority Solar One—2.8 km
Amazon BDL44 MW3.2 km
Pepperidge Farm Bloomfield3 MW5.5 km
Algonquin Windsor Locks71 MW5.7 km