← Back to map

Bradley Energy Center

Hartford County, Connecticut · EIA plant ID 58327 · Operator: Ameresco Select Inc
Natural gasNatural Gas Internal Combustion EngineISONEBA: ISNE
Nameplate6MWSummer 6 MW
Generators4in service
Net generation11GWh12 mo to Dec 2025
Capacity factor22%gas/coal/oil units, summer MW
Heat rate8,010Btu/kWhfossil units, electric fuel, HHV
First online2002Runs as intermediate

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.511.52GWh20122013201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2012201420162018202020222024202622.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
5,0007,50010,00012,50015,000201220142016201820202022202420268,010 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201219.939.1%11,606
201317.133.6%13,650
201416.833.0%13,845
201514.227.9%14,259
201614.328.1%7,300
201715.129.7%7,298
201815.330.1%7,240
201915.330.1%7,308
202013.827.0%7,410
202113.927.3%7,591
202213.827.1%7,618
202312.925.3%7,826
202411.823.1%8,128
202511.322.2%8,010

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
UNIT1Natural Gas Internal Combustion EngineIC1.51.5Nov 2002Operating—coming soon
UNIT2Natural Gas Internal Combustion EngineIC1.21.2Nov 2002Operating—coming soon
UNIT3Natural Gas Internal Combustion EngineIC1.21.2Nov 2002Operating—coming soon
UNIT4Natural Gas Internal Combustion EngineIC1.91.9Aug 2010Operating—coming soon

Owner / operator

Operator: Ameresco Select Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Connecticut Airport Authority100.0%6 MW

Nearby plants

Within 80 km.
Windsor Locks—0.3 km
CT Airport Authority Solar One—1.2 km
Rainbow (CT)8 MW1.6 km
Amazon BDL44 MW3.3 km
Algonquin Windsor Locks71 MW4.8 km
Pepperidge Farm Bloomfield3 MW7.1 km