← Back to map

Hornet Solar II (TX) (Hybrid)Planned

Swisher County, Texas · EIA plant ID 67985 · Operator: vesper energy development llc
SolarERCOTBA: ERCO

400 MW planned (Batteries, Solar Photovoltaic), first expected Mar 2028 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
HRNT2Solar PhotovoltaicPV200200planned Mar 2028Planned—coming soon
HRT2BBatteriesBA200200planned Mar 2028Planned—coming soon

Owner / operator

Operator: vesper energy development llc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Hornet Solar (TX)600 MW0.2 km
TX Nazareth Solar—0.7 km
Changing Winds—8.2 km
Hart Wind166 MW14 km
Astra Wind Farm163 MW32.7 km
TX Hereford Wind200 MW34.9 km