Changing WindsPlanned
Castro County, Texas · EIA plant ID 59243 · Operator: Invenergy Services LLC
288 MW planned (Onshore Wind Turbine), first expected Mar 2028 · EIA-860M
Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| CHAN1 | Onshore Wind Turbine | WT | 288 | 288 | planned Mar 2028 | Planned | — | coming soon |
Owner / operator
Operator: Invenergy Services LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| TX Nazareth Solar | — | 7.9 km |
| Hornet Solar (TX) | 600 MW | 8 km |
| Hornet Solar II (TX) (Hybrid) | — | 8.2 km |
| Hart Wind | 166 MW | 14.8 km |
| TX Hereford Wind | 200 MW | 28.5 km |
| Astra Wind Farm | 163 MW | 28.6 km |