TX Hereford Wind

Deaf Smith County, Texas · EIA plant ID 58773 · Operator: Boralex US Operations LLC
WindOnshore Wind TurbineERCOTBA: ERCO
Nameplate200MWSummer 200 MW
Generators1in service
Net generation617GWh12 mo to Aug 2026
Capacity factor35%wind units, summer MW
Heat rate—thermal plants only
First online2014

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
020406080GWh201520162017201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%20162018202020222024202635.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2015665.938.0%—
2016740.442.1%—
2017740.542.3%—
2018784.444.8%—
2019750.742.9%—
202075342.9%—
2021626.135.7%—
2022759.743.4%—
2023718.141.0%—
2024748.942.6%—
2025526.330.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Onshore Wind TurbineWT200200Dec 2014Operating—ge 1.85-82.5

Owner / operator

Operator: Boralex US Operations LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Boralex US Wind TNM LLC50.0%100 MW
Axium Great Plains Wind, LLC50.0%100 MW

Nearby plants

Within 80 km.
TX Jumbo Road Wind300 MW7.9 km
Astra Wind Farm163 MW11.4 km
Easter—18.4 km
Renegade Solar Project (Dawn)—20.3 km
Changing Winds—28.5 km
Bethel Wind Farm LLC276 MW33.5 km