EasterUnder construction

Castro County, Texas · EIA plant ID 59971 · Operator: Enbridge Wind (Easter), LLC
WindERCOTBA: ERCO

152 MW under construction (Onshore Wind Turbine), first expected Mar 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 152 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
ESTR1Onshore Wind TurbineWT152152planned Mar 2027Under construction—coming soon

Owner / operator

Operator: Enbridge Wind (Easter), LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
TX Jumbo Road Wind300 MW10.6 km
Bethel Wind Farm LLC276 MW15.3 km
TX Hereford Wind200 MW18.4 km
Mariah del Norte230 MW20.7 km
Renegade Solar Project (Dawn)—28.1 km
Astra Wind Farm163 MW29.6 km