Luna Valley

Fresno County, California · EIA plant ID 67848 · Operator: Luna Valley Solar I, LLC
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate200MWSummer 200 MW
Generators1in service
Net generation393GWh12 mo to Aug 2026
Capacity factor22%solar units, summer MW
Heat rate—thermal plants only
First online2025

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02040GWh2026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20252026202722.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2025134.618.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
LVPVSolar PhotovoltaicPV200200Aug 2025Operating—coming soon

Owner / operator

Operator: Luna Valley Solar I, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Luna Valley Solar I, LLC100.0%200 MW

Nearby plants

Within 80 km.
RE Tranquillity277 MW1.2 km
Great Valley Solar Portfolio Holdings, LLC203 MW2.4 km
Scarlet II Hybrid350 MW2.7 km
Scarlet Solar (CA)240 MW3.7 km
EDPR CA Solar Park VI LLC (CA) Hybrid—4.3 km
EDPR Scarlet III—5 km