Scarlet Solar (CA)
Fresno County, California · EIA plant ID 64908 · Operator: EDP Renewables North America LLC
Nameplate240MWSummer 240 MW
Generators2in service
Net generation469GWh12 mo to Aug 2026
Capacity factor27%solar units, summer MW
Heat rate—thermal plants only
First online2024
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2024 | 263.3 | 26.0% | — |
| 2025 | 480.8 | 27.9% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| GEN01 | Solar Photovoltaic | PV | 200 | 200 | Jun 2024 | Operating | — | coming soon |
| GEN02 | Batteries | BA | 40 | 40 | Jun 2024 | Operating | — | coming soon |
Owner / operator
Operator: EDP Renewables North America LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| EDP Renewables North America LLC | 100.0% | 240 MW |
Nearby plants
Within 80 km.
| Scarlet II Hybrid | 350 MW | 1.4 km |
| EDPR Scarlet III | — | 1.6 km |
| Great Valley Solar Portfolio Holdings, LLC | 203 MW | 2.4 km |
| EDPR CA Solar Park VI LLC (CA) Hybrid | — | 3.4 km |
| Luna Valley | 200 MW | 3.7 km |
| RE Tranquillity | 277 MW | 4.2 km |