← Back to map

Fayette Solar

Ross County, Ohio · EIA plant ID 67166 · Operator: Geronimo Energy
SolarSolar PhotovoltaicPJMBA: PJM
Nameplate45MWSummer 45 MW
Generators1in service
Net generation93GWh12 mo to Aug 2026
Capacity factor24%solar units, summer MW
Heat rate—thermal plants only
First online2025

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02.557.510GWh20252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20252026202723.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202588.922.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
FYTSLSolar PhotovoltaicPV4545Jan 2025Operating—coming soon

Owner / operator

Operator: Geronimo Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Geronimo Energy100.0%45 MW

Nearby plants

Within 80 km.
Ross County Solar, LLC120 MW7.5 km
Pickaway Solar100 MW27.5 km
Yellowbud Solar, LLC274 MW31.6 km
Buckeye Solar100 MW31.9 km
Clinton Solar (OH)50 MW32.1 km
Yellow Wood Solar Energy LLC—35.8 km