← Back to map

Yellowbud Solar, LLC

Ross County, Ohio · EIA plant ID 64832 · Operator: Geronimo Energy
SolarSolar PhotovoltaicPJMBA: PJM
Nameplate274MWSummer 274 MW
Generators1in service
Net generation509GWh12 mo to Aug 2026
Capacity factor21%solar units, summer MW
Heat rate—thermal plants only
First online2023

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0204060GWh202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2023202420252026202721.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202327619.6%—
2024511.721.3%—
2025503.721.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
YELLOSolar PhotovoltaicPV274274Jun 2023Operating—coming soon

Owner / operator

Operator: Geronimo Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Geronimo Energy100.0%274 MW

Nearby plants

Within 80 km.
Pickaway Solar100 MW11.4 km
Salt City Solar Project - Hybrid50 MW13.2 km
Buckeye Solar100 MW13.3 km
P H Glatfelter Co -Chillicothe Facility93 MW21.3 km
Darby Power, LLC564 MW25.4 km
Ross County Solar, LLC120 MW31.5 km