Yellow Wood Solar Energy LLCUnder construction
Clinton County, Ohio · EIA plant ID 69963 · Operator: Invenergy Services LLC
300 MW under construction (Solar Photovoltaic), first expected Dec 2027 · EIA-860M
Nameplate—MWSummer — MW
Generators0in service · 300 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| YLWWD | Solar Photovoltaic | PV | 300 | 300 | planned Dec 2027 | Under construction | — | coming soon |
Owner / operator
Operator: Invenergy Services LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| Palomino Solar | — | 6.3 km |
| Clinton Solar (OH) | 50 MW | 7.9 km |
| Dodson Creek Solar, LLC | 117 MW | 10.2 km |
| Clinton Battery | retired | 14.9 km |
| Hecate Energy Highland LLC | 300 MW | 21 km |
| New Market Solar | 100 MW | 22.2 km |