Byrne Solar, LLC

Kent County, Michigan · EIA plant ID 67100 · Operator: Byrne Solar, LLC
SolarSolar PhotovoltaicMISOBA: MISO
Nameplate5MWSummer 5 MW
Generators1in service
Net generation10GWh12 mo to Dec 2025
Capacity factor23%solar units, summer MW
Heat rate—thermal plants only
First online2023

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.51GWh202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%202320242025202623.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20230.21.8%—
20249.922.6%—
202510.323.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BYR05Solar PhotovoltaicPV55Oct 2023Operating—coming soon

Owner / operator

Operator: Byrne Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Byrne Solar, LLC100.0%5 MW

Nearby plants

Within 80 km.
Ada Cogeneration LP33 MW12.4 km
Chatham7 MW12.7 km
Ada Dam1 MW13 km
Cascade Dam2 MW17.4 km
Kent County Waste to Energy Facility18 MW26.8 km
Bissell Solar and Battery Generator1 MW27.4 km