← Back to map

Ada Cogeneration LP

Kent County, Michigan · EIA plant ID 10819 · Operator: Ada Cogeneration LLC
Natural gasNatural Gas Fired Combined CycleMISOBA: MISO
Nameplate33MWSummer 30 MW
Generators2in service
Net generation185GWh12 mo to Dec 2025
Capacity factor70%gas/coal/oil units, summer MW
Heat rate7,767Btu/kWhfossil units, electric fuel, HHV
First online1990Runs as baseload

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
01020GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%50%100%2005201020152020202570.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
5,0006,0007,0008,000200520102015202020257,767 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001230.7——
2002223——
200319.77.7%6,696
2004174.767.6%5,908
2005206.380.1%5,908
2006227.988.5%5,908
2007231.689.9%5,933
2008236.691.6%5,866
2009198.777.1%5,958
2010206.180.0%5,935
2011197.176.5%5,852
2012157.460.9%5,903
2013181.370.4%5,887
201420377.2%5,874
2015166.863.5%5,902
2016162.161.5%7,818
2017165.763.0%7,813
2018183.769.9%7,783
2019137.152.2%7,982
2020143.554.4%7,855
2021193.573.6%7,777
2022247.994.3%7,709
2023181.168.9%7,768
2024157.959.9%7,817
2025184.970.3%7,767

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Natural Gas Fired Combined CycleCT2322Oct 1990Operating—coming soon
GEN2Natural Gas Fired Combined CycleCA10.18Oct 1990Operating—coming soon

Owner / operator

Operator: Ada Cogeneration LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Ada Cogeneration LLC100.0%33 MW

Nearby plants

Within 80 km.
Ada Dam1 MW1.5 km
Cascade Dam2 MW5.9 km
Chatham7 MW12.3 km
Byrne Solar, LLC5 MW12.4 km
Kent County Waste to Energy Facility18 MW16.3 km
Bissell Solar and Battery Generator1 MW19.3 km