← Back to map

SR McNeal

Cochise County, Arizona · EIA plant ID 66925 · Operator: SR McNeal, LLC
BatteryBatteriesSolar PhotovoltaicBA: TEPC
Nameplate40MWSummer 40 MW
Generators2in service
Net generation54GWh12 mo to Aug 2026
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online2023

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0246GWh202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20230——
202455.7——
202552.8——

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
MCBABatteriesBA2020Dec 2023Operating—coming soon
MCNEASolar PhotovoltaicPV2020Dec 2023Operating—coming soon

Owner / operator

Operator: SR McNeal, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
SR McNeal, LLC100.0%40 MW

Nearby plants

Within 80 km.
Douglas26 MW25.4 km
THREE SISTERS Solar Generation and BESS—56.6 km
Apache Station782 MW59 km
Apache Solar I40 MW59.8 km
Sulphur Springs20 MW60.1 km
Fort Huachuca Solar PV Project18 MW61.5 km