Roadrunner Wind Farm

Eastland County, Texas · EIA plant ID 66902 · Operator: Roadrunner Crossing Wind Farm, LLC
WindOnshore Wind TurbineERCOTBA: ERCO
Nameplate256MWSummer 256 MW
Generators1in service
Net generation997GWh12 mo to Aug 2026
Capacity factor44%wind units, summer MW
Heat rate—thermal plants only
First online2024

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0255075100GWh20252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%202420252026202744.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2024491.743.5%—
2025931.641.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
5317Onshore Wind TurbineWT256256Jul 2024Operating—ge 2.82-127

Owner / operator

Operator: Roadrunner Crossing Wind Farm, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Roadrunner Crossing Wind Farm, LLC100.0%256 MW

Nearby plants

Within 80 km.
Roadrunner Crossing Energy Storage150 MW2.6 km
Sequoia 1401 MW4.6 km
Longhorn Storage165 MW4.8 km
Century Oak Wind Project, LLC152 MW4.8 km
Enbridge Solar (Sequoia II)—12.3 km
CISCO BESS10 MW13.3 km