CISCO BESS

Eastland County, Texas · EIA plant ID 66795 · Operator: HEN Infrastructure, L.L.C.
BatteryBatteriesERCOTBA: ERCO
Nameplate10MWSummer 10 MW
Generators1in service
Net generation-0GWh12 mo to Dec 2025
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online2024

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-40-30-20-100MWh20242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2024-0.1——
2025-0.3——

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CISCOBatteriesBA9.99.9Oct 2024Operating—coming soon

Owner / operator

Operator: HEN Infrastructure, L.L.C.. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Manulife Infrastructure II Holdings A, L.P.52.9%5 MW
John Hancock Funding Company43.1%4 MW
Hunt Energy Network, LLC4.0%0 MW

Nearby plants

Within 80 km.
Roadrunner Crossing Energy Storage150 MW12.4 km
Roadrunner Wind Farm256 MW13.3 km
Century Oak Wind Project, LLC152 MW17.5 km
Longhorn Storage165 MW17.5 km
Sequoia 1401 MW17.6 km
Enbridge Solar (Sequoia II)—19.1 km