Sequoia 1

Eastland County, Texas · EIA plant ID 68200 · Operator: Sequoia 1 Solar Project
SolarSolar PhotovoltaicERCOTBA: ERCO
Nameplate401MWSummer 401 MW
Generators1in service
Net generation703GWh12 mo to Aug 2026
Capacity factor27%solar units, summer MW
Heat rate—thermal plants only
First online2025

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0255075100GWh2026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20252026202726.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202521.17.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SEQ1Solar PhotovoltaicPV401.4401.4Dec 2025Operating—coming soon

Owner / operator

Operator: Sequoia 1 Solar Project. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Sequoia 1 Solar Project100.0%401 MW

Nearby plants

Within 80 km.
Longhorn Storage165 MW1.1 km
Century Oak Wind Project, LLC152 MW1.1 km
Roadrunner Wind Farm256 MW4.6 km
Roadrunner Crossing Energy Storage150 MW5.4 km
Enbridge Solar (Sequoia II)—10.9 km
Ranchland Wind Storage73 MW15.4 km