← Back to map

Conflitti Solar

Fresno County, California · EIA plant ID 66892 · Operator: CES Electron Farm One, LLC
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate4MWSummer 4 MW
Generators1in service
Net generation0GWh12 mo to Dec 2025
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online2026

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
020406080100MWh2025

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20250.1——

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CNFTISolar PhotovoltaicPV4.44.4Jan 2026Operating—coming soon

Owner / operator

Operator: CES Electron Farm One, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
CES Electron Farm One, LLC100.0%4 MW

Nearby plants

Within 80 km.
Midway BESS—2.8 km
Iron BESS—2.8 km
Panoche Energy Center432 MW2.8 km
CalPeak Power Panoche Peaker Plant61 MW2.9 km
Panoche Peaker57 MW2.9 km
Midway Peaking LLC140 MW3 km