Orion III Solar Project

Milam County, Texas · EIA plant ID 66821 · Operator: Ben Milam Solar 3 LLC
SolarSolar PhotovoltaicERCOTBA: ERCO
Nameplate250MWSummer 250 MW
Generators1in service
Net generation537GWh12 mo to Aug 2026
Capacity factor25%solar units, summer MW
Heat rate—thermal plants only
First online2024

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0204060GWh20252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%202420252026202724.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2024234.825.6%—
2025551.825.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
ORN3Solar PhotovoltaicPV250250Aug 2024Operating—coming soon

Owner / operator

Operator: Ben Milam Solar 3 LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Ben Milam Solar 3 LLC100.0%250 MW

Nearby plants

Within 80 km.
Hermes Storage BESS—3 km
OCI Stillhouse Solar210 MW4 km
Hermes Solar PV—4.1 km
BT Jungmann40 MW8.9 km
Sypert Branch Solar—11.3 km
Orion I Solar Project200 MW12.4 km