← Back to map

Sypert Branch SolarUnder construction

Milam County, Texas · EIA plant ID 69150 · Operator: Sypert Branch Solar LLC
SolarERCOTBA: ERCO

294 MW under construction (Solar Photovoltaic), first expected Dec 2026 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 294 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SYPRTSolar PhotovoltaicPV293.9260planned Dec 2026Under construction—coming soon

Owner / operator

Operator: Sypert Branch Solar LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
OCI Stillhouse Solar210 MW10.4 km
Orion III Solar Project250 MW11.3 km
Hermes Storage BESS—12.5 km
Hermes Solar PV—13.2 km
BT Jungmann40 MW13.4 km
Five Wells Solar Center - Hybrid618 MW14.8 km