East Cleveland Road Solar

Merced County, California · EIA plant ID 66810 · Operator: RPCA Solar 7, LLC
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate3MWSummer 3 MW
Generators1in service
Net generation6GWh12 mo to Dec 2025
Capacity factor25%solar units, summer MW
Heat rate—thermal plants only
First online2025

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.250.50.751GWh2025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2025202624.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20255.924.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
ECLESolar PhotovoltaicPV33Feb 2025Operating—coming soon

Owner / operator

Operator: RPCA Solar 7, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
RPCA Solar 7, LLC100.0%3 MW

Nearby plants

Within 80 km.
El Nido Facility13 MW7.5 km
Merced Pipeline4 MW11.4 km
Adera Solar20 MW11.8 km
Diamond H Dairy Power2 MW14.2 km
Five H Farms Solar Array1 MW14.6 km
Mission Solar LLC2 MW16 km