← Back to map

Diamond H Dairy Power

Madera County, California · EIA plant ID 64622 · Operator: Madera DP 2, LLC
OtherOther Waste BiomassCAISOBA: CISO
Nameplate2MWSummer 2 MW
Generators2in service
Net generation12GWh12 mo to Dec 2025
Capacity factor66%other units, summer MW
Heat rate—thermal plants only
First online2021

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.250.50.751GWh2022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), other units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%20212022202320242025202665.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20212.557.0%—
202210.560.1%—
202310.962.2%—
202411.967.8%—
202511.565.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Other Waste BiomassIC11Oct 2021Operating—coming soon
GEN2Other Waste BiomassIC11Oct 2021Operating—coming soon

Owner / operator

Operator: Madera DP 2, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Madera DP 2, LLC100.0%2 MW

Nearby plants

Within 80 km.
Costa View Farms5 MW6.4 km
Adera Solar20 MW12.4 km
Five H Farms Solar Array1 MW13.6 km
East Cleveland Road Solar3 MW14.2 km
Ampersand Chowchilla Biomass LLC13 MW14.9 km
Chowchilla II50 MW15 km