← Back to map

Mission Solar LLC

Merced County, California · EIA plant ID 59267 · Operator: Ecos Energy LLC
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate2MWSummer 2 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor27%solar units, summer MW
Heat rate—thermal plants only
First online2014

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400MWh20152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%201420162018202020222024202627.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201400.0%—
20152.317.4%—
20163.627.3%—
20173.425.6%—
20182.720.8%—
20193.829.0%—
2020430.4%—
20214.232.0%—
20224.332.8%—
20234.131.5%—
20243.829.2%—
20253.627.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PV9Solar PhotovoltaicPV1.51.5Dec 2014Operating—coming soon

Owner / operator

Operator: Ecos Energy LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Ecos Energy LLC100.0%2 MW

Nearby plants

Within 80 km.
Merced Solar LLC2 MW0.2 km
Merced Pipeline4 MW6 km
El Nido Facility13 MW9 km
2097 Helton Solar Project2 MW9.6 km
Broadway 3 - UC Merced 11 MW11.7 km
UC Merced Solar Hybrid5 MW11.8 km