← Back to map

UC Merced Solar Hybrid

Merced County, California · EIA plant ID 61995 · Operator: GSRP
SolarBatteriesSolar PhotovoltaicCAISOBA: CISO
Nameplate5MWSummer 5 MW
Generators2in service
Net generation8GWh12 mo to Dec 2025
Capacity factor21%solar units, summer MW
Heat rate—thermal plants only
First online2018

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.250.50.751GWh2019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20182019202020212022202320242025202621.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20180.26.9%—
20198.522.6%—
20208.221.6%—
20218.321.9%—
20228.522.9%—
20238.522.6%—
20246.517.4%—
2025821.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
UCMBABatteriesBA0.50.5Dec 2018Operating—coming soon
UCMPVSolar PhotovoltaicPV4.54.3Dec 2018Operating—coming soon

Owner / operator

Operator: GSRP. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Regions Bank100.0%5 MW

Nearby plants

Within 80 km.
Broadway 3 - UC Merced 11 MW0.2 km
2097 Helton Solar Project2 MW6.8 km
Mission Solar LLC2 MW11.8 km
Merced Solar LLC2 MW11.8 km
Parker3 MW12.5 km
Merced Pipeline4 MW17.8 km