← Back to map

Stanton Battery Energy Storage

Orange County, California · EIA plant ID 66423 · Operator: Wellhead Services Inc
BatteryBatteriesCAISOBA: CISO
Nameplate69MWSummer 69 MW
Generators1in service
Net generation-10GWh12 mo to Aug 2026
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online2023

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-1.25-1-0.75-0.5-0.250GWh202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2023-1.7——
2024-10.9——
2025-10——

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BESS1BatteriesBA68.868.8Nov 2023Operating—coming soon

Owner / operator

Operator: Wellhead Services Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Wellhead Services Inc100.0%69 MW

Nearby plants

Within 80 km.
Stanton Energy Reliability Center Hybrid161 MW0.3 km
Barre Peaker50 MW0.5 km
Westminster Reliability Project, LLC—4.3 km
BCE Los Alamitos 220 MW6.3 km
Anaheim Solar Energy Plant2 MW6.4 km
BCE Los Alamitos 120 MW7.2 km