Natural gasNatural Gas Fired Combustion TurbineCAISOBA: CISO
Nameplate50MWSummer 49 MW
Generators1in service
Net generation5GWh12 mo to Dec 2025
Capacity factor1%gas/coal/oil units, summer MW
Heat rate11,712Btu/kWhfossil units, electric fuel, HHV
First online2007Runs as peaking

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
024GWh2007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%20102015202020251.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
9,00010,00011,00012,00013,000201020152020202511,712 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20079.26.7%11,744
20084.71.1%12,055
20092.70.7%13,205
20106.41.6%11,615
20116.21.4%11,493
201225.55.9%10,595
201316.33.8%10,750
201429.46.9%10,452
201533.17.7%10,145
201628.86.7%10,269
201733.17.7%10,169
201833.17.7%10,229
201918.94.4%10,351
202044.410.3%10,122
2021286.5%10,183
202223.25.4%10,286
202320.44.8%11,056
202412.72.9%10,724
20255.41.3%11,712

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Natural Gas Fired Combustion TurbineGT49.849Sep 2007Operating—coming soon

Owner / operator

Operator: Southern California Edison Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Southern California Edison Co100.0%50 MW

Nearby plants

Within 80 km.
Stanton Energy Reliability Center Hybrid161 MW0.2 km
Stanton Battery Energy Storage69 MW0.5 km
Westminster Reliability Project, LLC—4.6 km
Anaheim Solar Energy Plant2 MW5.9 km
BCE Los Alamitos 220 MW6.8 km
AT&T Anaheim1 MW6.9 km