Brainerd Airport

Crow Wing County, Minnesota · EIA plant ID 66339 · Operator: AEP Onsite Partners
SolarSolar PhotovoltaicMISOBA: MISO
Nameplate6MWSummer 6 MW
Generators1in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online2022

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.51GWh20232024

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2022202320242025

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202200.1%—
202310.420.5%—
20241019.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BRN01Solar PhotovoltaicPV5.85.8Dec 2022Operating—coming soon

Owner / operator

Operator: AEP Onsite Partners. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
AEP Onsite Partners100.0%6 MW

Nearby plants

Within 80 km.
Brainerd Public Utilities3 MW3.6 km
Brainerd Waste Water Plant1 MW9 km
Sylvan Solar15 MW20.4 km
Sylvan2 MW20.5 km
Pillager2 MW27.7 km
Camp Ripley Solar11 MW36.7 km