Pillager

Cass County, Minnesota · EIA plant ID 1898 · Operator: ALLETE, Inc.
HydroConventional HydroelectricMISOBA: MISO
Nameplate2MWSummer 2 MW
Generators2in service
Net generation7GWh12 mo to Dec 2025
Capacity factor44%hydro units, summer MW
Heat rate—thermal plants only
First online1917

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0123GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%2005201020152020202543.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20019.761.7%—
200210.566.8%—
20038.252.1%—
20049.765.0%—
200511.375.9%—
20068.355.5%—
20077.245.4%—
20088.754.8%—
20099.459.6%—
201010.767.6%—
201110.667.5%—
2012865.4%—
20138.569.1%—
20149.980.7%—
20159.577.4%—
201611.375.9%—
20179.564.1%—
201810.369.5%—
20198.556.8%—
202012.180.7%—
20215.939.7%—
20226.543.6%—
20235.738.6%—
20246.845.4%—
20256.543.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Conventional HydroelectricHY0.80.9Jan 1917Operating—coming soon
2Conventional HydroelectricHY0.80.8Jan 1917Operating (Out of service)—coming soon

Owner / operator

Operator: ALLETE, Inc.. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
ALLETE, Inc.100.0%2 MW

Nearby plants

Within 80 km.
Sylvan Solar15 MW7.5 km
Sylvan2 MW8.3 km
Brainerd Waste Water Plant1 MW19.8 km
Brainerd Public Utilities3 MW24.2 km
Camp Ripley Solar11 MW27.4 km
Brainerd Airport6 MW27.7 km