Camp Ripley Solar

Morrison County, Minnesota · EIA plant ID 64072 · Operator: Camp Riley Solar Facility
SolarSolar PhotovoltaicMISOBA: MISO
Nameplate11MWSummer 11 MW
Generators1in service
Net generation14GWh12 mo to Dec 2025
Capacity factor15%solar units, summer MW
Heat rate—thermal plants only
First online2016

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.511.52GWh202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%202020212022202320242025202615.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202016.217.0%—
202117.218.2%—
202216.117.0%—
202315.816.7%—
20241515.9%—
202514.215.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CR1Solar PhotovoltaicPV10.910.8Nov 2016Operating—coming soon

Owner / operator

Operator: Camp Riley Solar Facility. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Farm Credit Leasing Services Corporation100.0%11 MW

Nearby plants

Within 80 km.
Little Falls (MN)5 MW13.1 km
Sylvan2 MW24 km
Blanchard18 MW25.6 km
Sylvan Solar15 MW26.2 km
Pillager2 MW27.4 km
Brainerd Waste Water Plant1 MW28.8 km