Timmerman Power Plant
Caldwell County, Texas · EIA plant ID 66335 · Operator: Lower Colorado River Authority
Nameplate368MWSummer 366 MW
Generators20in service
Net generation208GWh12 mo to Dec 2025
Capacity factor31%gas/coal/oil units, summer MW
Heat rate9,963Btu/kWhfossil units, electric fuel, HHV
First online2025Runs as intermediate
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2025 | 207.9 | 31.4% | 9,963 |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| G1 | Natural Gas Internal Combustion Engine | IC | 18 | 18 | Aug 2025 | Operating | — | coming soon |
| G10 | Natural Gas Internal Combustion Engine | IC | 18 | 18 | Aug 2025 | Operating | — | coming soon |
| G11 | Natural Gas Internal Combustion Engine | IC | 18.8 | 18.6 | Apr 2026 | Operating | — | coming soon |
| G12 | Natural Gas Internal Combustion Engine | IC | 18.8 | 18.6 | Apr 2026 | Operating | — | coming soon |
| G13 | Natural Gas Internal Combustion Engine | IC | 18.8 | 18.6 | Apr 2026 | Operating | — | coming soon |
| G14 | Natural Gas Internal Combustion Engine | IC | 18.8 | 18.6 | Apr 2026 | Operating | — | coming soon |
| G15 | Natural Gas Internal Combustion Engine | IC | 18.8 | 18.6 | Apr 2026 | Operating | — | coming soon |
| G16 | Natural Gas Internal Combustion Engine | IC | 18.8 | 18.6 | Apr 2026 | Operating | — | coming soon |
| G17 | Natural Gas Internal Combustion Engine | IC | 18.8 | 18.6 | Apr 2026 | Operating | — | coming soon |
| G18 | Natural Gas Internal Combustion Engine | IC | 18.8 | 18.6 | Apr 2026 | Operating | — | coming soon |
| G19 | Natural Gas Internal Combustion Engine | IC | 18.8 | 18.6 | Apr 2026 | Operating | — | coming soon |
| G2 | Natural Gas Internal Combustion Engine | IC | 18 | 18 | Aug 2025 | Operating | — | coming soon |
| G20 | Natural Gas Internal Combustion Engine | IC | 18.8 | 18.6 | Apr 2026 | Operating | — | coming soon |
| G3 | Natural Gas Internal Combustion Engine | IC | 18 | 18 | Aug 2025 | Operating | — | coming soon |
| G4 | Natural Gas Internal Combustion Engine | IC | 18 | 18 | Aug 2025 | Operating | — | coming soon |
| G5 | Natural Gas Internal Combustion Engine | IC | 18 | 18 | Aug 2025 | Operating | — | coming soon |
| G6 | Natural Gas Internal Combustion Engine | IC | 18 | 18 | Aug 2025 | Operating | — | coming soon |
| G7 | Natural Gas Internal Combustion Engine | IC | 18 | 18 | Aug 2025 | Operating | — | coming soon |
| G8 | Natural Gas Internal Combustion Engine | IC | 18 | 18 | Aug 2025 | Operating | — | coming soon |
| G9 | Natural Gas Internal Combustion Engine | IC | 18 | 18 | Aug 2025 | Operating | — | coming soon |
Owner / operator
Operator: Lower Colorado River Authority. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Lower Colorado River Authority | 100.0% | 368 MW |
Nearby plants
Within 80 km.
| Metro BESS | — | 18.9 km |
| Hays Energy Project | 989 MW | 20.5 km |
| Buda BESS | 10 MW | 22.7 km |
| Mesquite Creek LFGTE Project | 3 MW | 25.9 km |
| CF BESS NINE | — | 32.2 km |
| Dunlap TP 1 | 4 MW | 34.8 km |