← Back to map

Mesquite Creek LFGTE Project

Comal County, Texas · EIA plant ID 57167 · Operator: WM Renewable Energy LLC
OtherLandfill GasERCOTBA: ERCO
Nameplate3MWSummer 3 MW
Generators2in service
Net generation24GWh12 mo to Dec 2025
Capacity factor86%other units, summer MW
Heat rate—thermal plants only
First online2010

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
012GWh20102012201420162018202020222024

Capacity factor by year

Net MWh ÷ (summer MW × hours), other units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%20102012201420162018202020222024202685.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20101.669.2%—
201123.182.4%—
201222.580.2%—
201322.981.7%—
201422.178.8%—
201525.992.3%—
201624.185.8%—
201724.386.7%—
20182589.0%—
201924.487.0%—
20202589.1%—
202123.884.8%—
20222071.2%—
202321.476.2%—
202423.984.9%—
20252485.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Landfill GasIC1.61.6Dec 2010Operating—coming soon
GEN2Landfill GasIC1.61.6Dec 2010Operating—coming soon

Owner / operator

Operator: WM Renewable Energy LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
WM Renewable Energy LLC100.0%3 MW

Nearby plants

Within 80 km.
Hays Energy Project989 MW5.8 km
Dunlap TP 14 MW11 km
Abbott TP 33 MW16 km
Rio Nogales Power Project1,108 MW16.7 km
Guadalupe Generating Station1,088 MW17 km
Niagara Bottling - Seguin5 MW17 km