← Back to map

Lake Elsinore Canopies - Lakeside HS

Riverside County, California · EIA plant ID 66242 · Operator: Standard Solar
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate1MWSummer 1 MW
Generators1in service
Net generation2GWh12 mo to Dec 2025
Capacity factor23%solar units, summer MW
Heat rate—thermal plants only
First online2022

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
050100150200MWh202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2022202320242025202622.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20221.925.3%—
2023222.4%—
20241.821.0%—
2025222.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
LSHSSolar PhotovoltaicPV11Mar 2022Operating—coming soon

Owner / operator

Operator: Standard Solar. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Standard Solar100.0%1 MW

Nearby plants

Within 80 km.
Ortega Grid, LLC20 MW5.3 km
Chiquito Grid, LLC—15 km
EMWD - Sun City RWRF2 MW15.5 km
Ortega Highway Energy Storage2 MW19 km
EMWD - Perris Valley RWRF3 MW20.8 km
Menifee Power Bank680 MW21.2 km