← Back to map

Menifee Power Bank

Riverside County, California · EIA plant ID 66494 · Operator: Nova Power, LLC
BatteryBatteriesCAISOBA: CISO
Nameplate680MWSummer 680 MW
Generators5in service
Net generation-134GWh12 mo to Aug 2026
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online2024

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-15-10-50GWh20252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2024-59.4——
2025-117.5——

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
NOVA1BatteriesBA230230Jun 2024Operating—coming soon
NOVA2BatteriesBA230230Jul 2024Operating—coming soon
NOVA3BatteriesBA5050Aug 2024Operating—coming soon
NOVA4BatteriesBA110110Sep 2024Operating—coming soon
NOVA5BatteriesBA6060Jul 2025Operating—coming soon

Owner / operator

Operator: Nova Power, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nova Power, LLC100.0%680 MW

Nearby plants

Within 80 km.
EMWD - Perris Valley RWRF3 MW2.9 km
EMWD - Sun City RWRF2 MW6.6 km
Diamond Valley Solar Project1 MW9.4 km
Perris8 MW10.9 km
Diamond Valley Lake30 MW11.3 km
Perris DC 5 - sline0152 MW13.6 km